Differences between revisions 6 and 7
Revision 6 as of 2011-12-10 14:11:13
Size: 1125
Editor: NorbertMath
Comment:
Revision 7 as of 2011-12-11 21:17:46
Size: 1420
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
test setup for NonNewtonianLiquid for sound installation test setup for NonNewtonianLiquid for sound installation<<BR>>
Line 5: Line 5:
prep radio show on 13th dec prep radio show on 13th dec - done, realized by norbert and reni
Line 12: Line 12:
folder: rhizom folder: rhizom <<BR>>
material: FolderText
Line 14: Line 15:
12.12. deadline - cultureconnected kulturkontakt
school project
Line 17: Line 16:
collecting ideas for the exhibition project in may/june 2012; 12.12. deadline - cultureconnected kulturkontakt<<BR>>
school project, reni - will try to finish it tomorrow

collecting ideas for the exhibition project in may/june 2012; <<BR>>
Line 19: Line 21:
Line 23: Line 24:
soundcard for piezos - further testing, with hannes soundcard for piezos - further testing, chrstian with hannes, prototyping eld to a 5khz 8bit soundcard.
Line 25: Line 26:
led-hannes: users can deposit a request for switching the led on, from 0,5 to 3sec; always when a groundstation has contact, the request will be fullfilled and then afterwards the user gets the info via email, when precicely this was done. led-hannes: users can deposit a request for switching the led on, from 0,5 to 3sec; always when a groundstation has contact, the request will be fullfilled and then afterwards the user gets the info via email, when precicely this was done.<<BR>>
Line 28: Line 29:
open: how to integrate the solar cells; open: how to integrate the solar cells; -> christian and günther scetched a complete plan for the energy model
Line 30: Line 31:
group foto!!! group foto!!! -> next time
Line 32: Line 33:
sunday evening: ESPI visit -> lets go out for dinner sunday evening: ESPI visit -> we went out for dinner, and had a long and nice talk

plans for the worklab from 8 - 11th december 2011

test setup for NonNewtonianLiquid for sound installation

prep radio show on 13th dec - done, realized by norbert and reni

storing data projects - on the sd card, save into SVN folder, already existing folder "contrib data" -> "payload data" there will be a deadline to store data (children's wishes, compressed radio show/alien production)

folder: rhizom
material: FolderText

12.12. deadline - cultureconnected kulturkontakt
school project, reni - will try to finish it tomorrow

collecting ideas for the exhibition project in may/june 2012;
energy consumption of the exhibition in comparison with the satellite

testing the payload tranceiver - how much watts does it really send out?

soundcard for piezos - further testing, chrstian with hannes, prototyping eld to a 5khz 8bit soundcard.

led-hannes: users can deposit a request for switching the led on, from 0,5 to 3sec; always when a groundstation has contact, the request will be fullfilled and then afterwards the user gets the info via email, when precicely this was done.
first remote controlled artifical star.

open: how to integrate the solar cells; -> christian and günther scetched a complete plan for the energy model

group foto!!! -> next time

sunday evening: ESPI visit -> we went out for dinner, and had a long and nice talk

sat: WorkLab4 (last edited 2012-04-20 18:59:29 by ReniHofmueller)