|
Size: 1386
Comment:
|
Size: 1420
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
| test setup for NonNewtonianLiquid for sound installation | test setup for NonNewtonianLiquid for sound installation<<BR>> |
| Line 5: | Line 5: |
| prep radio show on 13th dec topic: Art possible ideas: there was a "international Sputnik Day" celebration 2007 http://www.irmielin.org/works/sputnik/program.htm they have maybe interesting sound pieces there check out the essays of Lisa Parks http://lisaparks.blogspot.com/ |
prep radio show on 13th dec - done, realized by norbert and reni |
| Line 21: | Line 12: |
| folder: rhizom | folder: rhizom <<BR>> material: FolderText |
| Line 23: | Line 15: |
| 12.12. deadline - cultureconnected kulturkontakt school project |
|
| Line 26: | Line 16: |
| collecting ideas for the exhibition project in may/june 2012; | 12.12. deadline - cultureconnected kulturkontakt<<BR>> school project, reni - will try to finish it tomorrow collecting ideas for the exhibition project in may/june 2012; <<BR>> |
| Line 28: | Line 21: |
| Line 32: | Line 24: |
| soundcard for piezos - further testing, with hannes | soundcard for piezos - further testing, chrstian with hannes, prototyping eld to a 5khz 8bit soundcard. |
| Line 34: | Line 26: |
| led-hannes: users can deposit a request for switching the led on, from 0,5 to 3sec; always when a groundstation has contact, the request will be fullfilled and then afterwards the user gets the info via email, when precicely this was done. | led-hannes: users can deposit a request for switching the led on, from 0,5 to 3sec; always when a groundstation has contact, the request will be fullfilled and then afterwards the user gets the info via email, when precicely this was done.<<BR>> |
| Line 37: | Line 29: |
| open: how to integrate the solar cells; | open: how to integrate the solar cells; -> christian and günther scetched a complete plan for the energy model |
| Line 39: | Line 31: |
| group foto!!! | group foto!!! -> next time |
| Line 41: | Line 33: |
| sunday evening: ESPI visit -> lets go out for dinner | sunday evening: ESPI visit -> we went out for dinner, and had a long and nice talk |
plans for the worklab from 8 - 11th december 2011
test setup for NonNewtonianLiquid for sound installation
prep radio show on 13th dec - done, realized by norbert and reni
storing data projects - on the sd card, save into SVN folder, already existing folder "contrib data" -> "payload data" there will be a deadline to store data (children's wishes, compressed radio show/alien production)
folder: rhizom
material: FolderText
12.12. deadline - cultureconnected kulturkontakt
school project, reni - will try to finish it tomorrow
collecting ideas for the exhibition project in may/june 2012;
energy consumption of the exhibition in comparison with the satellite
testing the payload tranceiver - how much watts does it really send out?
soundcard for piezos - further testing, chrstian with hannes, prototyping eld to a 5khz 8bit soundcard.
led-hannes: users can deposit a request for switching the led on, from 0,5 to 3sec; always when a groundstation has contact, the request will be fullfilled and then afterwards the user gets the info via email, when precicely this was done.
first remote controlled artifical star.
open: how to integrate the solar cells; -> christian and günther scetched a complete plan for the energy model
group foto!!! -> next time
sunday evening: ESPI visit -> we went out for dinner, and had a long and nice talk
