Differences between revisions 3 and 4
Revision 3 as of 2012-05-29 18:16:57
Size: 973
Comment:
Revision 4 as of 2012-05-29 18:17:08
Size: 971
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Going from a condensed presentation as best-practice project on Monday, 28th of May 2012, going to an indepth talk on the 31st of May and introduction to sonifications of satellite position data (TLE), and having a 2day workshop, friday 1st and Saturday 2nd Of June, as part of the MUTEK-festival.<<BR>>. Going from a condensed presentation as best-practice project on Monday, 28th of May 2012, going to an indepth talk on the 31st of May and introduction to sonifications of satellite position data (TLE), and having a 2day workshop, friday 1st and Saturday 2nd Of June, as part of the MUTEK-festival.<<BR>>

ICAS/ECAS and MUTEK-festival in Montreal, May/june 2012

Jogi and Reni are invited to present various ideas and concepts that emerged around building mursat1.

Going from a condensed presentation as best-practice project on Monday, 28th of May 2012, going to an indepth talk on the 31st of May and introduction to sonifications of satellite position data (TLE), and having a 2day workshop, friday 1st and Saturday 2nd Of June, as part of the MUTEK-festival.
First day: field trip, second day: sonification hands on. TLE -> OSC

Here I collect some infos that can be useful for presentations additionaly from what we have found and produced ourselves already.

space debris
http://www.esa.int/esaCP/SEMHDJXJD1E_FeatureWeek_0.html

space debris braunschweig: 20000days in space
http://www.youtube.com/watch?v=pkfKnxX-L0k&feature=related

satellites wondering over night sky
http://www.youtube.com/watch?v=tztaK8v8-ck&feature=fvwrel

sat: Montreal (last edited 2012-06-23 14:18:18 by ReniHofmueller)